06/25/2021 11:39:53 AM                                                  Job Profit                                                                  Page 1
Program: ARPRSPJ                                                     Company: Demo B                                                   Session: 9367  HIT
								In Sequence By Customer Id, Job Id
									$ Amounts Per CY
 
                                       CYs        Sales      Material    Material        Plant    Delivery         Admin        Total       Gross
                                                  Price         Cost       Margin     Overhead        Cost      Overhead         Cost       Profit      %
 
Cust ALLEN      Allen Construction
      108 NORTHSIDE                 336.00         64.13        29.73        34.40         8.12         7.41         6.06        52.64        11.48     17.9
      178 N. ELM                     14.00         63.00        30.64        32.36         8.00        15.16         6.00        60.55         2.45      3.9
      B&R WHOLESALERS                25.00         61.80        29.94        31.86         9.00         1.00          .00        41.34        20.46     33.1
      BIRCHWOOD ACRES               240.00         60.00        29.67        30.33         8.00         8.55         6.00        52.97         7.03     11.7
      ECHO VALLEY                  1103.50         64.97        31.20        33.77         9.37         3.52         7.21        52.70        12.27     18.9
      GEORGIA STATE                 130.32         65.47        29.79        35.68        10.82          .72         5.97        48.07        17.40     26.6
      MEIJER                         50.00         57.00        29.94        27.06         8.00         2.40         6.00        46.34        10.66     18.7
      PARK-N-RIDE                  6506.51         55.63        28.63        27.00         8.19         8.71         6.08        53.32         2.31      4.2
      RED OAKS                       71.50         63.06        30.15        32.91         8.00          .84         6.00        46.96        16.09     25.5
      VALE DO ECO                     5.00         63.00        29.94        33.06         8.00         1.50         6.00        47.19        15.81     25.1
      Total Job Id                  172.00         59.35        29.99        29.35         8.16         5.03         5.02        50.45         8.90     15.0
   Total Customer ALLEN            8653.83         57.60        29.10        28.49         8.37         7.68         6.18        52.95         4.65      8.1


Option Notes
Batch Time If the plant of origin does not have a Batch Time constant set, the report will use this constant. Number of minutes to batch a load.
Delivery Rate If the plant of origin does not have a Delivery Rate set, the report will use this rate. Cost in dollars per minute to keep a truck running and pay the driver.
Plant Overhead If the plant of origin does not have a Plant Overhead rate set, the report will use this rate. Cost in dollars per unit to maintain and operate the plant.
Unit Of Measure You want the report given in this Unit of Measure. You must give the Plant Overhead rate in these units, whether specified here or for each plant in Plants file maintenance (page 140).
Assume Discounts Check this box to have gross profit figures calculated by assuming that you took any paid-on-time discounts offered. If the box is unchecked, the report assumes that you took no discounts.
Material Product Class Select the product class(es) containing the mixes you want to cost.
Modern Format Use the newer format.
Assume Discounts Treat discounts as taken, reducing expected profit.