Dispatch Load Schedule Report
Jump to navigation
Jump to search
Current Sequence Selections
- Plant, Load Date/Time, Customer Id, Order Id
- Load Date/Time, Plant, Customer Id, Order Id
- Plant, Customer Id, Order Id
- Load Date/Time, Customer Id, Order Id
- Customer Id, Load Date/Time, Order Id
Current Selection Criteria
- Delivery Date
- Plant No
- Cust Id
- Order Code
Layout
- The report will subtotal yardage and count loads based on the first two fields of the Sequence selection.
- Job, Load Count, Load Size and Product codes are on the right side of the report.
- The first few fields on the report will vary to remain consistent with the Sequence selection.
- There are checkboxes to generate subtotals by Unit of Measure and/or by Product, as well as Material Usage.
Additional notes:
- Any WILL-CALL order will have a "W" next to the Load Date/Time
- An asterisk (*) after Return Time indicates a load was late beyond the Late Tolerance threshold.
- If an order has an asterisk (*) between the date and time, it means the PROJECTED LOAD date is different from the Order Date in Dispatch Order Maintenance.